Auger Boring and Steel Pipe Ramming

Where larger excavations are possible, these techniques offer a rapid method of installing steel crossings beneath embankments, railways, airport runways and roads with minimal risk of settlement. This is a traditional method of installing new pipelines and is performed by diesel or hydraulic driven equipment. Diameters from DN150 to DN2300 are available, and any combination of pipes or ducts can be inserted.